AI Data Center Energy Supply

Powering the Future of AI Data Centers

Across the U.S., the race to build large-scale AI Data Centers is accelerating—each demanding unprecedented levels of energy. PERC delivers comprehensive design engineering and project management services to support natural gas infrastructure for AI power plants up to 3 GW. With expertise spanning process, mechanical, and electrical engineering, along with surveying capabilities, PERC is the ideal partner for powering tomorrow’s intelligent infrastructure.

Featured AI Data Center Projects

Vantage AI Data Center – San Antonio, Texas

PERC is providing engineering design to supply the natural gas to the data center site including:

  • Detailed engineering design for the receipt point meter station and delivery point meter station at both ends of the pipeline
  • Site design provides maximum reliability and near 100% run-time for the data center
  • PERC provided the FEED study for the pipeline and gas infrastructure

FERMI AI Data Center – Amarillo, Texas

PERC is providing full project management to supply the natural gas to the data center site including:

  • Project management of a 4.3 mile 20” gas pipeline from Energy Transfer’s Transwestern system to the data center campus
  • Detailed engineering design for the receipt point meter station and delivery point meter station at both ends of the pipeline
  • PERC provided the FEED study for the pipeline and gas infrastructure
  • Inspection services during construction

>