PERC is providing full project management to supply the natural gas to the data center site including:

  • Project management of a 4.3 mile 20” gas pipeline from Energy Transfer’s Transwestern system to the data center campus
  • Detailed engineering design for the receipt point meter station and delivery point meter station at both ends of the pipeline
  • PERC provided the FEED study for the pipeline and gas infrastructure
  • Inspection services during construction